Rock wool board installation attention points Installation of rock wool board should pay attention to those matters * The work of the entire site A1 fireproof materials must be constructed in strict accordance with the relevant safety measures stipulated in the construction planning and construction technical measures. Establish and improve the safety production responsibility system of all departments at all levels, and implement the responsibility to people. The economic contracting of various aluminum silicate manufacturers has clear safety indicators and guarantee measures including rewards and punishments. Second, adhere to the safety education system of the new construction team; the project security officer should always check the operation team, the professional branch offices, and carefully complete the written work of the safety engineering of some sub-projects, and sign the two parties and the person to be paid. Third, large-scale construction equipment access inspection, installation and daily operations must be strictly controlled and supervised, equipment performance does not meet the safety requirements are not allowed to use. Fourth, the construction site must have a safety production billboard. Safety propaganda slogans or safety warning signs must be hung on the main construction site, operation site, danger zone and main passageway. During the construction phase, the protective measures for various types of openings shall be checked and recorded daily. Changes in protective facilities must be approved by the technical department and the project safety officer. After the change, there must be corresponding protective measures. The operation is fully restored after the operation, and the written materials are kept by the safety officer. Installation of rock wool board should pay attention to those matters Fifth, adhere to the safety value system of the management personnel of the project department. Every night, the members of the safety assurance system are arranged to insist on night duty; the maintenance settings around the construction site must be managed by special personnel. Sixth, strengthen the safety supervision and inspection system, and earnestly do a safety diary. Adhere to the inspection and evaluation system of the “three on-the-job, one-point commentary†activity of the team: the team must carry out the “three on-the-job†and the weekly “one comment†safety activities before the class. For the safety activities of the team, there must be assessment measures. Seventh, adhere to the safety monitoring system of dangerous points and important parts (areas). Adhere to the safety testing and setting up supervision for personnel engaged in dangerous operations: Special operating personnel must be certified to work after passing the training and examination, and the operation permit must be reviewed on time and must not be used overdue. Establish a “Employee Labor Protection Record Cardâ€. Eighth, the construction site must be equipped with adequate fire prevention, fire extinguishing facilities and equipment. And do a good job in correcting, preventing and adjusting the safety work. Regularly hold safety production, civilized construction regular meetings, and supervise safety inspection systems once a month.    Sterilization Case,Laparoscopic Instrument Sterilization Case,Laparoscopic Sterilization Trays,Medical Instrument Sterilizing Box ZHEJIANG SHENDASIAO MEDICAL INSTRUMENT CO.,LTD. , https://www.shendasiaomed.com